Footage to supply

Justin's footage goes here: soil cell install, e.g. Riverlea project and approval to show

Soil cells & tree pits

Soil cell tree pits under a mixed-use development

Project 02 of 06Spec

Location
Adelaide suburb
Client
developer
Head contractor
name
Designer
landscape architect
Year
year
Scope
number street trees in connected soil cell pits under a paved forecourt and footpath, with root barrier and irrigation. Soil volume m³
Systems
e.g. Citygreen Stratavault; root barrier product

The brief

The landscape architect drew a row of full-size street trees along a paved forecourt that takes foot traffic and the odd delivery van brief. Standard pits would have given each tree a couple of cubic metres of soil. That's nowhere near enough for the canopy on the drawings.

What we built

We excavated a continuous trench under the paving and built connected soil cell pits, so each tree shares a larger soil volume with its neighbours layout. The cells were filled with planting soil in layers, left uncompacted, then decked and wrapped in geotextile ready for the paver. Root barrier runs along the kerb and the building line. Each tree has an irrigation and aeration inlet at the trunk.

The detail that mattered

Services. The trench crossed existing services, and the cell layout was adjusted on site with the engineer's sign-off to clear them services and sign-off. The paving contractor laid straight over the deck without holding up the program program outcome.

Gallery3 frames

Send us a job like this one.

Drawings or a site address are enough to start.

0433 365 216 · info@asys.net.au